ما

1 4 8 pcc details of quantities of material

Designing and Proportioning Normal Concrete Mixtures ...

mining the quantities of concrete ingredients, using local ... Water to cementitious materials ratio 60 50 40 30 20 10 0 8 6 4 2 0 28-day compressive strength, MPa Air-entrained concrete 28-day compressive strength, 1000 psi ... 4 in. to 1 in. Adapted from ACI 211.1 and 1.3.

ادامه مطلب

ADDENDUM NO. ONE (1)

2. Revised Summary of Quantities 3. C109-1 PCC Joint Layout Exhibit 4. Revised Grading & Drainage Plan Concrete Apron, Sheet C135-2 5. Retaining Wall Profile, Sheet C202-2 6. Revised Drainage Details, Sheet C503-2 7. Revised General Notes, Legend, and Abbreviations, Sheet E001-3 8. Revised Apron Parking Lot New Work Plan, Sheet E102-3 9.

ادامه مطلب

MATERIALS METHOD Subject Code

Materials Methods 10, 10.1, 10.1M, 10.3 Portland Cement Inspection and Sampling of Cement at Batch Plants Materials Method 18.1 Sample Transmittal Instructions MURK Part 1B Construction Inspection Manual Materials Procedure (MP) 09-02 Precast Concrete QC/QA Procedures Materials Procedure (MP) 90-1 Microsilica (711-11) and HRP (711-14) Sampling ...

ادامه مطلب

Rate analysis for PCC 1:4:8 (M7.5) - calculate quantity ...

Rate Analysis for PCC 1:4:8 :-It is a summary of all the cost involved in doing particular work or unit work like material cost, labour cost, overhead expenses, water charges & contractor profit.For rate analysis, the details about all the operation involved in carrying out the work should be available. The quantities of materials …

ادامه مطلب

ESTIMATION AND COSTING (A70138)

1.4 METHODS OF TAKING OUT QUANTITIES The quantities like earth work, foundation concrete, brickwork in plinthand super structure etc., can be workout by any of following two methods: a) Long wall - short wall method b) Centre line method. c) Partly centre line and short wall method. 1.4.1 LONG WALL-SHORT WALL METHOD

ادامه مطلب

PCB plug - PCC 4/ 4-ST-7,62 - 1840175 | PHOENIX CONTACT

PCB plug - PCC 4/ 4-ST-7,62 1840175 PCB connector, nominal cross section: 4 mm 2, color: green, nominal current: 20 A, rated voltage (III/2): 1000 V, type of contact: connector, Number of potentials: 4, Number of rows: 1, Number of positions per row: 4, number of connections: 4, product range: PCC 4/..-ST, pitch: 7.62 mm, connection method: Crimp connection, conductor/PCB connection ...

ادامه مطلب

SLICE-1: - RENOVATION / CONSTRUCTION OF ADDITIONAL …

Excavation beyond given depth will be made up by contractor with PCC 1:4:8 at his own cost and nothing extra SLICE-1: - RENOVATION / CONSTRUCTION OF ADDITIONAL TOILETS, CONSTRUCTION OF BOUNDARY WALL, REPAIRING OF BOUNDARY WALL AND STONE PITCHING WORK AT CENTRE OF EXCELLENCE JAIPUR,ICAI BHAWAN,VILLAGE CHOSLA, TEHSIL CHAKSHU, DISTRICT- …

ادامه مطلب

Plain Cement Concrete (PCC)- Work Procedure - The Constructor

Generally 1:2:4 or 1:3:6 mix is used. The measurement of material can be done by weight batching or volume batching. In volume batching, coarse aggregate and sand shall be measured by measuring box of 30cmx30cmx38cm of a suitable size equivalent to one bag cement of 1/30 m 3 or 0.035 m 3. Sand shall be measured on the basis of its dry volume.

ادامه مطلب

What is Plain Cement Concrete (PCC) in Construction of ...

A strength of PCC is defined as compressive strength after 28 days, expressed as M15, M20, where M stands for Mix and 15 stands for 15 N/mm 2 compressive strength at 28 days. The proportions of materials (cement, sand, coarse aggregate) for nominal mix/design mix concrete that are normally used are 1:3:6 or 1:4:8.

ادامه مطلب

Rate analysis for concrete - calculate quantity and cost ...

Rate analysis for 1 cum concrete of M7.5 (1:4:8) M7.5 grade of concrete have cement, sand and aggregate ratio 1:4:8 in which one part is cement, 4 part is sand and 8 part is aggregate. For quantity and cost calculation for m7.5 grade of concrete we should follow following steps:-

ادامه مطلب

Estimating and-costing - SlideShare

a) C.C. (1:4:8) usy 40mm HBG metals for 30m3 of work b) RR masanry in CM(1:5) very 0.34m3 of CM for 1m3 of masanry for 20mof work sol : a) Quantity of Cement required = 13 1 ×1.52×30× 50 1440 =101bags b) 1m3 of RR masanry = 0.34m3 of CM (1:5) 20 m3 of RR masanry required = ? 20x 0.34=6.8m3 Quantityofcementrequired = 5 1 ×6.8× 50 1440 =39 ...

ادامه مطلب

PCC Concrete Ratio | Plain Cement Concrete | Calculate ...

Where 1 signifies the ratio of cement, 2 signify the ratio of sand (fine aggregate) and 4 for coarse aggregate (crushed stone). Dry volume = wet volume x 1.54. Determine crushed stone, cement and sand in PCC work. Concrete ratio is 1:2:4. Material is equal to material ratio/ratio sum x dry volume. Cement is equal to 1/1 + 2 + 4 x wet volume x 1.54

ادامه مطلب

ESTIMATION FOR CONSTRUCTION OF BUILDING

P.C.C. in (1:4:8) to use 40 mm metal including the cost off conveyance of all materials and labor charges etc. R.R. in c.m.(1:6) including the cost of conveyance of all materials and laborcharges R.C.C. (1:2:4) to use 40 mm metal including the cost and conveyance of all materials and labor charges etc

ادامه مطلب

Thumb Rules for Highrise Building to guide Civil Engineers ...

PCC 1: 4: 8 =3.4 bags/cum 15. PCC 1:5:10 =2.52 bags/cum 16. PCC 1:3:6 =4.2 bags/cum 17. PCC 1:2:4 =6.02 bags/cum ... The use of local aggregates and recycled materials in concrete makes it a 'green' product, which is requested by environmentally responsible owners. ... Can provide the above thumb rule details with relevant formula how it's ...

ادامه مطلب

Labor contractor rates in bangalore is Rs 250 to 350 / sq ...

PCC 1:4:8 4" thicknesses for the foundation. Size stone masonry 6 courses for foundation footings. Plinth concrete 5" thickness. Inside Floor PCC 5" Thickness. 9" and 4" thickness brickwork for walls. Door and Window Frames Fixing. Lintel concreting. Roof concreting. Inside …

ادامه مطلب

Project Management for Construction: Cost Estimation

The work items in this project include (1) drilling exploratory bore holes at 50 ft intervals for grout tubes, and (2) pumping grout into the voids of a soil layer between 4 and 6 ft thick. The quantities for these two items are estimated on the basis of the landfill area: 8 acres = (8)(43,560 ft 2 /acre) = 348,480 ft 2

ادامه مطلب

pcc 1 4 8 calculation

Feb 07, 2019· A strength of PCC is defined as compressive strength after 28 days, expressed as M15, M20, where M stands for Mix and 15 stands for 15 N/mm 2 compressive strength at 28 days. The proportions of materials (cement, sand, coarse aggregate) for nominal mix/design mix concrete that are normally used are 1:3:6 or 1:4:8. Read More

ادامه مطلب

Concrete Mix Design | Different Grades of Concrete

8 bags of cement required for 1 cu.m of M20 grade concrete. 672 kg of Sand required for 1 cu.m of M20 grade concrete. 1326 kg of 20mm Aggregate is required for 1 cu.m of M20 grade concrete. 200 litres of water is required for 1 cu.m of M20 grade concrete. Table for Quantity of Cement, Sand, Aggregate, Water required for Different grades of ...

ادامه مطلب

Design Guide 6 - USDA

(c) 1.5 if material passing No. 200 sieve is dust of fracture, free of clay or shale. (d) In areas exposed to traffic manufactured sand shall have a minimum ultimate polish value of 8, based on the parent rock.

ادامه مطلب

BILL OF QUANTITIES

PCC 1:3:6 and 40% 75mm down boulder) hill side, including excavation, leveling, backfilling, necessary form works and disposal of surplus earth within 50m lead complete as per drawing. m 10,000.00 3.2 A/R Construct box-drain with clear width 450 mm with 150mm thick base PCC 1:3:6, 300mm thick plum concrete (60% PCC 1:3:6 and 40% 75mm down ...

ادامه مطلب

APPENDIX-I QUANTITIES OF MATERIALS FOR COMPLETED …

S.No. Item Unit Material Quantities of Materials Remarks 1 Hard moorum filling Cum Moorum 1.00 cum 2 Rammed sand filling cum sand 1.00 cum 3 Rammed moorum & boulder cum Moorum Boulder 0.40 cum 1.00 cum 4 Rammed moorum and metal (or shingle or gravel) cum Moorum Metal 0.33 cum 1.00 cum 5 Cement mortar 1:2 cum Cement Sand

ادامه مطلب

Contractor Resources

The Documentation of Contract Quantities Guide (or "Documentation Guide" for short) is the documentation section of IDOT's Construction Manual, containing policies which represent the minimum documentation requirements for use by construction personnel for the proper documentation of day to day events as well as contract pay quantities on the state's highway construction projects.

ادامه مطلب

PCC Volume Calculator | Free Estimate of Cement, Sand, Jelly

Plain Cement Concrete (PCC) is composed mixture of cement, aggregates, sand, water and chemical admixtures. Calculate portland cement concrete or PCC concrete mix design ratio in Cft and determine exactly how much quantity of cement, sand and aggregate is required for PCC construction.

ادامه مطلب

Civil Work - CONCRETE GRADE: M5 = 1:4:8 M10= 1:3:6 M15 ...

CONCRETE GRADE: M5 = 1:4:8 M10= 1:3:6 M15= 1:2:4 M20= 1:1.5:3 M25= 1:1:2 CLEAR COVER TO MAIN REINFORCEMENT: 1.FOOTINGS : 50 mm 2.RAFT FOUNDATION.TOP : 50 mm 3.RAFT ...

ادامه مطلب

How to Calculate Quantity Manhole Concrete | Materials ...

PCC [concrete] in floor = Length x breadth x average depth. PCC [concrete] in floor = 3 x 2.5 x [0.25 + 0]/2 = 0.9375 cft. RCC in slab = Length x breadth x thickness – π D 2 /4 x T [because there is a manhole in the slab] RCC in slab = (4.5 x 4 x 0.5) – π (1.5) 2 /4 x 0.5. RCC in slab = 9 – 0.884 = 8.12 cft. PCC [concrete] in floor = 0 ...

ادامه مطلب

Grades of Concrete with Proportion (Mix Ratio) - Civilology

Concrete grades are denoted by M10, M20, M30 according to their compressive strength. The "M" denotes Mix design of concrete followed by the compressive strength number in N/mm2. "Mix" is the respective ingredient proportions which are Cement: Sand: Aggregate Or Cement: Fine Aggregate: Coarse Aggregate. we already discussed the mix ...

ادامه مطلب

Calculation of Cement and Sand Quantity for Plastering

Volume of Sand required (using 1:4 proportion) = 0.036 x 4 = 0.144 x 1600 = 230 kgs (considering sand dry bulk density as 1600 kgs/cum.) Usually around 20% of water by weight of the total dry material is mixed in the mixture to achieve the desired workability.

ادامه مطلب

Building Materials Calculators - Apps on Google Play

Download the building materials calculators app to estimate the right quantities. Available calculators are. Excavation. PCC Estimators. RCC Estimators. TMT Steel to Rods. TMT Rods to Steel. Bricks Calculators. Block Calculators.

ادامه مطلب

RATE ANALYSIS OF CONSTRUCTION ITEMS

MATERIAL TAKEOFF for Item BOQ Quantities ----- Sr.No. Item of Work Description Qty Basic Unit Rate Amount ----- 1. Excavation Excavation in Ordinary Soil 500.000 cu.mt 130.13 65064.00 2. PCC M10 P.C.C. 1:3:6 in foundation /

ادامه مطلب

BACKFILL AND COMPACT TO FULL 1/2R A/C SLOPE 1/2 PER FT.

2.all portland cement concrete (pcc) shall be 4000 psi (6 sacks per cubic yard), 3/4" aggregate. 3.portland cement concrete shall be brush finished parallel to face of curb. 4.all curbs shall be backfilled before street is rocked and paved. 5.class 2 ab, subgrade & fill material shall have a minimum of 95% compaction under curb.

ادامه مطلب